Description
Romboutsstraat 3/7 - 1932 Sint-Stevens-Woluwe
Clusterpark has been constructed early 2000 and the office buildings are fully equipped to meet modern requirements. The buildings are built on a slope which enables that the offices are accessed by means of the front door on the ground level.
Read more
Surface details
Floor | Available space | Nature |
---|---|---|
2 | 348.00 sq.m | Office |
Nature | Available space |
---|---|
Global | 348.00 sq.m |
Min. | 348.00 sq.m |
Office | 348.00 sq.m |